New products available in design softwares via Climecon Plugin

Our product range has grown with new products in air terminal devices, louvres, and professional kitchen ventilation solutions. The new devices are ready to be added into designs with the easy-to-use Climecon plugin.

Hood.X: MistMaster water mist hood

Objects for the MistMaster water mist hood, especially designed for cooking with open flames and charcoal grilles, can be found in MagiCAD and Revit. Additionally, MistMaster objects contain electricity, cold water and sewer connections, which facilitate the design work on the Revit side.

Go to Huuva.X

Tuisku.X: Louvres with defrost heating

MagiCAD and Revit now include objects for TUISKU-AF louvres with defrost heating. The recently launched TUISKU-AF prevent the formation of ice and frost on the surface of the grille. This way, the operation of the devices is guaranteed even at low temperatures while the pressure losses remain under control.

Go to Tuisku.X

Vent.X: OLOi-HF exhaust air device ready for designs

The OLOi-HF is an exhaust air device for significantly large, up to 500 dm3/s air volumes. The device complements the collection of OLO diffusers for suspended ceilings. In addition to the already available OLO supply air diffuser and OLOi exhaust air device, the new OLOi-HF objects can be found in Vent.X, MagiCAD, and Revit.

Go to Vent.X

News

Get to know: Sales Manager Veli-Matti Piispanen

A favorite among customers, Veli-Matti knows snow and rain covers, roof hoods, and hoods like the back of his hand. Veli-Matti, or Velsu as he’s known to friends, has been working at Climecon since 1999. In addition to his sales role, he also helps manage products for snow and rain covers, and roof hoods together with the Product Manager. His enthusiasm for his work is as strong as it was at the start of his career, and as a thrill-seeker, Velsu is always ready for new adventures.

Read more

Manage life cycle costs effectively – energy-saving smart ventilation

The costs of a construction project do not end when the building site is completed. The real expenses accumulate over the entire lifecycle of the building: from energy use, maintenance, and the lifespan of the systems. When new systems are put out to tender, the purchase price alone does not reveal the total cost of the investment. The Life Cycle Costs show which solution is truly sensible both economically and environmentally. When solutions are designed to be long-lasting and energy-efficient, the building consumes less energy, emissions decrease, and indoor air quality remains high year after year.

Read more

Importance of accurate adjustment in air terminal devices

Unbalanced ventilation system is not energy efficient and often leads to indoor air problems. When the devices and the airflow rates are dimensioned correctly, just the right amount of air goes to the right place – not too little nor too much. In this way, the entire ventilation system works as planned. A properly adjusted ventilation system is energy efficient, air distribution is controlled, even and quiet.

Read more